In association with
Logo Logo Logo

Traffic resumes on Karnali corridor road


MANMA:- The Karnali corridor road which was obstructed due to landslide at different sections has resumed.
The landslide debris that had deposited on the road at Bar, Gobrebhid, Kholibazaar and Simkhet along the Lalighat of Kalikot district to Sallisalla of Humla has been removed and traffic resumed on this section of the corridor highway.
The landslide had deposited huge boulders at different places along the roadway. The Nepali Army had worked continuously to open the road.
Nepali Army Major, Prem Karki said the road has been opened after 15 days since it got blocked.
The Kalikot, Bajura and Humla folks faced much inconvenience due to the disruption of vehicular traffic. Karnali corridor roadway was obstructed due to the landslide triggered by incessant rains for four days since October 17.

For Indian tourists travelling by land:- 72 hours (-ve) C-19 report, CCMC form and Antigen Test at entry point

For Indian tourists travelling by land:- 72 hours (-ve) C-19 report, CCMC form and Antigen Test at entry point

Comment here !
Related News

KATHMANDU:- The National Examination Board is preparing to publish the results of class 12 today. A meeting of the board

By Sitaram Adhikari, DHADING:- Many of the indigenous Chepang children at Simthali in Benighatrorang rural municipality-2 in Dhading district have

MYAGDI:- Beni Bazaar is facing a plethora of problems due to the increasing encroachment on its roads. The physical structures

SIMKOT:- A total of 78 quintals of food grains was transported to Limi at Namkha Rural Municipality-6 on Monday. Limi