In association with
Logo Logo Logo

Nepal: River erosion troubles waste management

“The flood-fed Madi river eroded the landfill site and also took away the piled-up wastes”, Dhungana said adding, “The municipality has not been able to lift the waste from different areas due to lack of space”
Representative Image PIcture- my Republica

DAMAULI:- Tanahun’s Byas municipality has failed to collect solid waste from the town area for the past one month with the Madi River eroded the dumping site.

The solid waste of the municipality has not been picked after the river took away the dumping site at Byas municipality-3, Bhateri. Municipality’s Sanitation Sub-section Chief Bhagyashali Dhungana shared erosion of landfill site has troubled solid waste management works in the town area. “The flood-fed Madi river eroded the landfill site and also took away the piled-up wastes”, Dhungana said adding, “The municipality has not been able to lift the waste from different areas due to lack of space”

Comment here !
Related News

KATHMANDU;-The number of registered newspapers across the country is 7,874. According to the 46th Annual Report, 2077/78, published on the

KATHMANDU:- The National Federation of Nepalese Transport Entrepreneurs has called for immediately opening the roads that have been obstructed due

KATHMANDU:– Virtual discussion took place as part of the 3rd Global Nepali Health Conference, UK. The event was organized on

KATHMANDU:- The 24th memorial day of Ganeshman Singh, the supreme commander of the 1990 people’s movement for the restoration of