In association with
Logo Logo Logo

Marsyangdi hydropower project starts production


TANAHUN: Sixty nine megawatt electricity generated from Marsyangdi Hydropower Project has been added to the national grid.
The project with 69 megawatt capacity located in the district of Tanahun has started producing power in its full electricity from its three power stations, said electrical supervisor of the Centre, Shiva Ram Sharma.
It, however, produces 40 megawatts electricity during dry season as the water level in water sources has heavily receded during the season, he said. With this, the burden of the Nepal Electricity Authority (NEA) to purchase power from neighbouring India has eased to some extent, said the NEA.

Comment here !
Related News

KATHMANDU:- The World Bank’s Board of Executive Directors today approved $60 million to improve the quality of Nepal’s higher education,

KATHMANDU:- The World Bank has approved 60 million US dollars (approximately Rs 7.2 billion) to improve the quality of higher

KATHMANDU:- A consignment of 32 thousand 500 metric tonnes of Urea fertilizer procured from Bangladesh has arrived here. The fertilizer

KATHMANDU:- Germany has handed over health equipment including ventilators to the Government of Nepal. German Ambassador to Nepal Roland Schaefer